projects poland SCHUMACHER PACKAGING 1+2

SCHUMACHER PACKAGING 1+2

Client: SCHUMACHER PACKAGING Sp. z o.o. previously TEKTURA WROCŁAW Sp. z o.o.

Total land area: 104,189m²
Effective floor area stage 1: 14,525m²
Effective floor area stage 2:   8,672m²
Building volume stage 1: 123,470m³
Building volume stage 2:   83,930m³
Paved areas: 18,258 m²
Lawns: 72,191m²

Location: Krępice near Wrocław
Construction time stage 1: January 1999 - September 1999
The design for the first construction stage was made in Tetera Design Office
Construction time stage 2: May 2004 - December 2004

Scope of services: conceptual design, basic project evaluation, approvals, building permit design, tender documentation, working design, design supervision, site supervision

This factory was developed as a plant for corrugated boards, foil and packaging production: production hall and the office building connected to the hall by means of a glazed passage. The central building part is a presentable lounge with exposed stairway. The factory has its own waste water treatment plant.

pl | en | de

W ramach naszej witryny stosujemy pliki cookies w celu świadczenia Państwu usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Państwa urządzeniu końcowym. Możecie Państwo dokonać w każdym czasie zmiany ustawień dotyczących cookies.